List of Communities Pursuing an Opt-Out Municipal Aggregation Program

The following communities are pursuing municipal aggregation programs. This list includes communities with a referendum on the ballot in the next election, communities that have passed a referendum, as well as communities that have selected a supplier. The information reflected for communities that have selected a supplier is applicable to residential customers. Small commercial customers should check with the community or chosen supplier for rate information and terms and conditions. This list makes no claim to be complete or accurate. Please inform us of any addition or deletions that should be made. Each community name contains a link to the source of information that caused the community to be on this list. Last updated on July 31, 2014.

Community Status Supplier Rate
(cents per kWh)
Current
Contract
Ends
Termination
Fees
Service Area Referendum
Date

Abingdon

Supplier Chosen Integrys Energy Services 4.394 August 2014 $25 Ameren Illinois April 2013

Addieville

Referendum Passed Ameren Illinois March 2014

Addison

Program Expired in June 2014 ComEd March 2012

Albers

Supplier Chosen Homefield Energy 4.480 June 2016 $0 Ameren Illinois November 2012

Albion

Referendum Passed Ameren Illinois March 2014

Algonquin

Supplier Chosen Direct Energy 7.2 July 2015 ComEd March 2014

Alma

Referendum Passed Ameren Illinois March 2014

Alorton

Supplier Chosen Homefield Energy 4.433 May 2015 $0 Ameren Illinois April 2013

Alton

Supplier Chosen Homefield Energy 4.746 June 2016 $0 Ameren Illinois March 2012

Amboy

Supplier Chosen FirstEnergy Solutions 4.67 August 2014 $0 ComEd March 2012

Annawan

Supplier Chosen Integrys Energy Services 4.330 July 2014 $0 Ameren Illinois November 2012

Antioch

Program Expired in June 2014 ComEd March 2012

Apple River

Supplier Chosen FirstEnergy Solutions 5.84 July 2015 $0 ComEd April 2013

Arcola

Supplier Chosen Homefield Energy 4.580 June 2016 $0 Ameren Illinois November 2012

Argenta

Supplier Chosen Integrys Energy Services 4.280 August 2014 $25 Ameren Illinois April 2013

Arlington Heights

Supplier Chosen Constellation Energy 6.621 May 2017 $0 ComEd March 2012

Aroma Park

Supplier Chosen FirstEnergy Solutions 4.983 February 2015 $0 ComEd November 2012

Arthur

Program Expired in June 2014 Ameren Illinois November 2012

Ashland

Supplier Chosen FirstEnergy Solutions 4.194 February 2016 $0 Ameren Illinois November 2012

Ashley

Supplier Chosen Homefield Energy 4.194 June 2015 $0 Ameren Illinois April 2013

Ashmore

Supplier Chosen Homefield Energy 4.580 June 2016 $0 Ameren Illinois November 2012

Ashton

Supplier Chosen FirstEnergy Solutions 5.18 July 2015 $25 ComEd March 2012

Assumption

Supplier Chosen Constellation Energy 4.203 March 2015 $0 Ameren Illinois April 2013

Astoria

Supplier Chosen Integrys Energy Services 4.09 June 2015 $0 Ameren Illinois April 2013

Athens

Supplier Chosen Homefield Energy 4.247 January 2015 $0 Ameren Illinois November 2012

Atlanta

Supplier Chosen Integrys Energy Services 4.181 September 2014 $0 Ameren Illinois March 2012

Auburn

Program expired in May 2014 Ameren Illinois November 2012

Aurora

Supplier Chosen Homefield Energy 8.086 August 2016 $0 ComEd March 2012

Aurora Township

Supplier Chosen Direct Energy Services 7.2 September 2017 $0 ComEd November 2012

Aviston

Supplier Chosen Homefield Energy 4.580 June 2016 $0 Ameren Illinois March 2012

Baldwin

Supplier Chosen Homefield Energy 4.395 March 2015 $0 Ameren Illinois April 2013

Bannockburn

Supplier Chosen MC Squared 4.964 September 2015 ComEd March 2012

Barrington

Supplier Chosen MC Squared 4.739 August 2014 $0 ComEd March 2012

Bartonville

Supplier Chosen Homefield Energy 4.580 June 2016 $0 Ameren Illinois November 2012

Beach Park

Program Expired in July 2014 ComEd April 2013

Beardstown

Supplier Chosen FirstEnergy Solutions 4.194 February 2016 $0 Ameren Illinois November 2012

Beckemeyer

Supplier Chosen Homefield Energy 4.580 June 2016 $0 Ameren Illinois November 2012

Bedford Park

Supplier Chosen Constellation Energy 5.384 November 2014 $0 ComEd March 2012

Beecher

Supplier Chosen FirstEnergy Solutions 4.83 October 2014 $0 ComEd March 2012

Beecher City

Supplier Chosen Homefield Energy 4.480 June 2016 $0 Ameren Illinois November 2012

Belle Rive

Supplier Chosen Homefield Energy 4.194 June 2015 $0 Ameren Illinois April 2013

Belleville

Supplier Chosen Homefield Energy 4.4809 June 2016 $0 Ameren Illinois November 2012

Belvidere

Program Expired in July 2014 ComEd March 2012

Belvidere Township

Supplier Chosen Constellation Energy 5.229 January 2015 $0 ComEd November 2012

Benld

Supplier Chosen Homefield Energy 4.247 February 2015 $0 Ameren Illinois November 2012

Bensenville

Supplier Chosen FirstEnergy Solutions 5.205 January 2016 $0 ComEd November 2012

Benton

Supplier Chosen FirstEnergy Solutions 4.17 March 2015 $0 Ameren Illinois November 2012

Bethalto

Supplier Chosen Homefield Energy 4.646 June 2016 $0 Ameren Illinois March 2012

Big Rock

Supplier Chosen Verde Energy USA 4.525 August 2014 $0 ComEd March 2012

Bloomington

Supplier Chosen Homefield Energy 4.539 May 2015 $0 Ameren Illinois April 2013

Bluffs

Supplier Chosen Constellation Energy 4.203 March 2015 $0 Ameren Illinois April 2013

Bluford

Supplier Chosen Homefield Energy 4.194 June 2015 $0 Ameren Illinois April 2013

Bolingbrook

Supplier Chosen FirstEnergy Solutions 4.83 October 2014 $0 ComEd March 2012

Bonfield

Supplier Chosen FirstEnergy Solutions 5.033 February 2015 $25 ComEd November 2012

Bonnie

Supplier Chosen Homefield Energy 4.194 June 2015 $0 Ameren Illinois April 2013

Bonus Township

Supplier Chosen Homefield Energy 5.773 August 2015 $0 ComEd April 2013

Bourbonnais

Supplier Chosen FirstEnergy Solutions 4.983 March 2015 $25 ComEd November 2012

Braceville

Program Expired in June 2014 ComEd April 2013

Bradford

Supplier Chosen Homefield Energy 4.373 July 2014 $0 Ameren Illinois April 2013

Bradley

Program Expired in July 2014 ComEd March 2012

Braidwood

Supplier Chosen FirstEnergy Solutions 4.83 October 2014 $0 ComEd March 2012

Bridgeport

Referendum Passed Ameren Illinois March 2014

Bridgeview

Supplier Chosen Constellation Energy 7.540 June 2017 $0 ComEd March 2012

Brimfield

Supplier Chosen Homefield Energy 4.580 June 2016 $0 Ameren Illinois March 2012

Brookfield

Program Expired in July 2014 ComEd March 2012

Brooklyn

Supplier Chosen Homefield Energy 4.333 May 2015 $0 Ameren Illinois April 2013

Brookville Township

Referendum Passed See Ogle County ComEd April 2013

Brownstown

Supplier Chosen Homefield Energy 4.194 June 2015 $0 Ameren Illinois April 2013

Buffalo

Program expired in May 2014 Ameren Illinois November 2012

Buffalo Grove

Supplier Chosen Constellation Energy 6.529 May 2017 $0 ComEd March 2012

Bunker Hill

Supplier Chosen Homefield Energy 4.247 February 2015 $0 Ameren Illinois November 2012

Burbank

Program Expired in June 2014 ComEd April 2013

Burlington

Supplier Chosen Verde Energy USA 4.525 August 2014 $0 ComEd March 2012

Burnham

Referendum Passed ComEd April 2013

Burritt Township

Supplier Chosen Homefield Energy 5.684 August 2015 $0 ComEd April 2013

Bush

Supplier Chosen Homefield Energy 4.395 March 2015 $0 Ameren Illinois April 2013

Byron

Supplier Chosen FirstEnergy Solutions 6.71 August 2017 $0 ComEd March 2012

Byron Township

Referendum Passed See Ogle County ComEd April 2013

Cahokia

Supplier Chosen Homefield Energy 4.333 May 2015 $0 Ameren Illinois April 2013

Caledonia

Referendum Passed ComEd March 2012

Calumet City

Program Expired in June 2014 ComEd November 2012

Camargo

Supplier Chosen Homefield Energy 4.480 June 2016 $0 Ameren Illinois November 2012

Cambria

Supplier Chosen Homefield Energy 4.395 March 2015 $0 Ameren Illinois April 2013

Cambridge

Supplier Chosen Homefield Energy 4.383 July 2016 $0 Ameren Illinois April 2013

Camp Point

Supplier Chosen Constellation Energy 4.203 March 2015 $0 Ameren Illinois April 2013

Campton Hills

Supplier Chosen MC Squared 4.397 August 2014 $0 ComEd March 2012

Canton

Supplier Chosen Homefield Energy 4.580 June 2016 Ameren Illinois March 2012

Cantrall

Program expired in May 2014 Ameren Illinois November 2012

Carbondale

Supplier Chosen Homefield Energy 4.350 March 2015 $0 Ameren Illinois November 2012

Carol Stream

Supplier Chosen FirstEnergy Solutions 5.313 January 2015 $0 ComEd November 2012

Carroll County

Supplier Chosen FirstEnergy Solutions 4.878 May 2015 $0 ComEd November 2012

Carthage

Supplier Chosen Homefield Energy 4.247 February 2015 $0 Ameren Illinois November 2012

Cary

Supplier Chosen FirstEnergy Solutions 4.99 November 2014 $0 ComEd March 2012

Cass County

Supplier Chosen Constellation Energy 4.203 March 2015 $0 Ameren Illinois April 2013

Catlin

Supplier Chosen Homefield Energy 4.433 May 2015 $0 Ameren Illinois April 2013

Cedarville

Supplier Chosen FirstEnergy Solutions 5.22 May 2016 $0 ComEd November 2012

Central City

Supplier Chosen Homefield Energy 4.194 June 2015 $0 Ameren Illinois April 2013

Centralia

Supplier Chosen Homefield Energy 4.580 June 2016 $0 Ameren Illinois November 2012

Centreville

Supplier Chosen Homefield Energy 4.433 May 2015 $0 Ameren Illinois April 2013

Cerro Gordo

Supplier Chosen Homefield Energy 4.480 June 2016 $0 Ameren Illinois November 2012

Champaign

Program Expired in June 2014 Ameren Illinois March 2012

Champaign County

Supplier Chosen Homefield Energy 4.560 June 2016 $0 Ameren Illinois November 2012

Channahon

Supplier Chosen FirstEnergy Solutions 4.83 October 2014 $0 ComEd March 2012

Chapin

Supplier Chosen Constellation Energy 4.203 March 2015 $0 Ameren Illinois April 2013

Charleston

Supplier Chosen Homefield Energy 4.480 June 2016 $0 Ameren Illinois November 2012

Chebanse

Program Expired in June 2014 Ameren Illinois November 2012

Cherry Valley

Supplier Chosen FirstEnergy Solutions 4.88 August 2014 $25 ComEd March 2012

Chester

Supplier Chosen Homefield Energy 4.346 March 2015 $0 Ameren Illinois November 2012

Chicago

Supplier Chosen Integrys Energy Services 5.589 through May 2014 May 2015 $0 ComEd November 2012

Chicago Heights

Program expired in April 2014 ComEd November 2012

Chicago Ridge

Supplier Chosen Verde Energy USA 4.6 October 2014 $50 ComEd March 2012

Chillicothe

Supplier Chosen Homefield Energy 4.660 June 2016 $0 Ameren Illinois March 2012

Chouteau Township

Supplier Chosen Homefield Energy 4.333 May 2015 $0 Ameren Illinois April 2013

Chrisman

Supplier Chosen Homefield Energy 4.557 August 2015 $0 Ameren Illinois April 2013

Christian County

Supplier Chosen FirstEnergy Solutions 4.194 February 2016 $0 Ameren Illinois November 2012

Christopher

Supplier Chosen FirstEnergy Solutions 4.17 March 2015 $0 Ameren Illinois November 2012

Cicero

Referendum Passed ComEd November 2012

Cisne

Referendum Passed Ameren Illinois March 2014

Clarendon Hills

Supplier Chosen Constellation Energy 5.313 January 2015 $0 ComEd November 2012

Clifton

Supplier Chosen Homefield Energy 4.333 May 2015 $0 Ameren Illinois April 2013

Clinton

Supplier Chosen Homefield Energy 4.481 May 2015 $0 Ameren Illinois April 2013

Coal City

Supplier Chosen FirstEnergy Solutions 4.83 October 2014 $0 ComEd March 2012

Coalton

Referendum Passed Ameren Illinois March 2014

Coatsburg

Supplier Chosen FirstEnergy Solutions 4.194 December 2015 $0 Ameren Illinois November 2012

Cobden

Supplier Chosen FirstEnergy Solutions 4.299 April 2015 $0 Ameren Illinois November 2012

Coles County

Supplier Chosen Homefield Energy 4.580 June 2016 $0 Ameren Illinois November 2012

Columbia

Supplier Chosen Homefield Energy 4.660 June 2016 $0 Ameren Illinois March 2012

Columbus

Supplier Chosen FirstEnergy Solutions 4.194 December 2015 $0 Ameren Illinois November 2012

Cortland

Supplier Chosen FirstEnergy Solutions 4.84 August 2014 $0 ComEd March 2012

Cortland Township

Referendum Passed ComEd March 2014

Coulterville

Supplier Chosen Homefield Energy 4.346 March 2015 $0 Ameren Illinois November 2012

Countryside

Supplier Chosen Homefield Energy 7.0 July 2016 $0 ComEd March 2012

Crainville

Supplier Chosen Homefield Energy 4.395 March 2015 $0 Ameren Illinois April 2013

Crawford County

Supplier Chosen Homefield Energy 4.580 June 2016 $0 Ameren Illinois November 2012

Creal Springs

Supplier Chosen Homefield Energy 4.395 March 2015 $0 Ameren Illinois April 2013

Crest Hill

Program expired in September 2013 ComEd April 2011

Crete

Supplier Chosen FirstEnergy Solutions 4.83 October 2014 $0 ComEd March 2012

Creve Coeur

Supplier Chosen Homefield Energy 4.746 June 2016 $0 Ameren Illinois March 2012

Crossville

Supplier Chosen Homefield Energy 4.194 June 2015 $0 Ameren Illinois April 2013

Crystal Lake

Supplier Chosen Homefield Energy 7.287 July 2016 $0 ComEd March 2012

Cuba

Referendum Passed Ameren Illinois March 2014

Cutler

Supplier Chosen Homefield Energy 4.395 March 2015 $0 Ameren Illinois April 2013

Dahlgren

Supplier Chosen Homefield Energy 4.194 June 2015 $0 Ameren Illinois April 2013

Dakota Township

Supplier Chosen Homefield Energy 5.719 August 2016 $0 ComEd April 2013

Dalton City

Supplier Chosen Integrys Energy Services 4.390 August 2014 $25 Ameren Illinois April 2013

Danville

Supplier Chosen Homefield Energy 4.333 May 2015 $0 Ameren Illinois April 2013

Darien

Supplier Chosen Verde Energy USA 7.75 July 2015 $0 ComEd March 2012

Davis

Supplier Chosen FirstEnergy Solutions 5.585 June 2016 $0 ComEd April 2013

Davis Junction

Supplier Chosen Constellation Energy 4.945 August 2014 $0 ComEd March 2012

Dawson

Program expired in May 2014 Ameren Illinois November 2012

De Soto

Supplier Chosen Homefield Energy 4.395 March 2015 $0 Ameren Illinois April 2013

Decatur

Supplier Chosen Homefield Energy 4.580 June 2016 $0 Ameren Illinois November 2012

Deer Creek

Supplier Chosen Homefield Energy 4.580 June 2016 $0 Ameren Illinois March 2012

Deer Park

Supplier Chosen MC Squared 4.512 October 2014 $0 ComEd March 2012

Deerfield

Supplier Chosen MC Squared 6.688 May 2015 $0 ComEd March 2012

DeKalb

Supplier Chosen Homefield Energy 5.789 August 2015 $0 ComEd March 2012

DeKalb Township

Supplier Chosen Homefield Energy 5.789 August 2015 $0 ComEd April 2013

Delavan

Supplier Chosen Homefield Energy 4.580 June 2016 $0 Ameren Illinois March 2012

DePue

Supplier Chosen Homefield Energy 4.33 July 2014 $0 Ameren Illinois March 2012

Dieterich

Supplier Chosen FirstEnergy Solutions 4.194 February 2016 $0 Ameren Illinois November 2012

Divernon

Program expired in May 2014 Ameren Illinois November 2012

Dix

Supplier Chosen Homefield Energy 4.194 June 2015 $0 Ameren Illinois April 2013

Dixon

Supplier Chosen Verde Energy USA 5.8472 July 2015 $0 ComEd April 2013

Dolton

Supplier Chosen Integrys Energy Services 9.370 August 2014 $0 ComEd November 2012

Dowell

Supplier Chosen Homefield Energy 4.395 March 2015 $0 Ameren Illinois April 2013

Downers Grove

Supplier Chosen FirstEnergy Solutions 4.75 August 2014 $0 ComEd March 2012

Downers Grove Township

Supplier Chosen MC Squared 5.920 December 2014 $0 ComEd April 2013

Du Quoin

Supplier Chosen Homefield Energy 4.588 October 2014 $0 Ameren Illinois March 2012

Dundee Township

Referendum Passed ComEd November 2012

Dunlap

Supplier Chosen Homefield Energy 4.580 July 2016 $0 Ameren Illinois March 2012

Dupo

Supplier Chosen Integrys Energy Services 4.276 August 2014 $0 Ameren Illinois April 2013

Durand

Supplier Chosen Constellation Energy 6.858 July 2017 $0 ComEd March 2012

Durand Township

Supplier Chosen FirstEnergy Solutions 5.75 July 2016 $0 ComEd April 2013

Dwight

Supplier Chosen FirstEnergy Solutions 7.88 July 2017 $0 ComEd March 2012

Eagle Point Township

Supplier Chosen FirstEnergy Solutions 5.121 April 2016 $0 ComEd November 2012

Earlville

Supplier Chosen FirstEnergy Solutions 5.48 February 2016 $0 ComEd November 2012

East Alton

Supplier Chosen Homefield Energy 4.580 June 2016 $0 Ameren Illinois November 2012

East Dundee

Program Expired in June 2014 ComEd March 2012

East Gillespie

Referendum Passed Ameren Illinois March 2014

East Peoria

Supplier Chosen Homefield Energy 4.746 June 2016 $0 Ameren Illinois March 2012

East St. Louis

Supplier Chosen Homefield Energy 4.433 May 2015 $0 Ameren Illinois April 2013

Easton

Supplier Chosen Homefield Energy 4.746 June 2016 $0 Ameren Illinois March 2012

Edinburg

Referendum Passed Ameren Illinois March 2014

Edwardsville

Supplier Chosen Homefield Energy 4.660 June 2016 $0 Ameren Illinois November 2012

Edwardsville Township

Supplier Chosen Homefield Energy 4.333 May 2015 $0 Ameren Illinois April 2013

Effingham

Supplier Chosen Homefield Energy 4.480 June 2016 $0 Ameren Illinois November 2012

Effingham County

Supplier Chosen FirstEnergy Solutions 4.194 February 2016 $0 Ameren Illinois November 2012

Ela Township (Unincorporated)

Supplier Chosen Homefield Energy 7.076 June 2016 $0 ComEd April 2013

Elburn

Supplier Chosen FirstEnergy Solutions 4.72 September 2014 $0 ComEd April 2011

Eldorado

Supplier Chosen Homefield Energy 4.395 March 2015 $0 Ameren Illinois April 2013

Elgin

Supplier Chosen Direct Energy 4.915 August 2014 $0 ComEd March 2012

Elkhart

Supplier Chosen Integrys Energy Services 4.720 September 2014 $0 Ameren Illinois November 2012

Elkville

Supplier Chosen Homefield Energy 4.346 March 2015 $0 Ameren Illinois November 2012

Ellis Grove

Supplier Chosen Homefield Energy 4.395 March 2015 $0 Ameren Illinois April 2013

Elmhurst

Supplier Chosen MC Squared 4.832 August 2014 $0 ComEd March 2012

Elmwood

Supplier Chosen Integrys Energy Services 4.405 August 2014 $0 Ameren Illinois March 2012

Elwood

Supplier Chosen FirstEnergy Solutions 4.83 October 2014 $0 ComEd March 2012

Emden

Supplier Chosen Integrys Energy Services 4.181 September 2014 $0 Ameren Illinois March 2012

Energy

Supplier Chosen Homefield Energy 4.395 March 2015 $0 Ameren Illinois April 2013

Erie

Supplier Chosen Nordic Energy Services 5.471 September 2014 $0 ComEd April 2011

Erin Township

Supplier Chosen Homefield Energy 5.861 September 2015 $0 ComEd April 2013

Essex

Supplier Chosen FirstEnergy Solutions 5.133 February 2015 $25 ComEd November 2012

Eureka

Supplier Chosen Homefield Energy 4.580 June 2016 $0 Ameren Illinois March 2012

Evanston

Supplier Chosen Homefield Energy USA 7.644 through August 2016 August 2017 $0 ComEd March 2012

Evansville

Supplier Chosen Homefield Energy 4.395 March 2015 $0 Ameren Illinois April 2013

Evergreen Park

Supplier Chosen Verde Energy USA 4.625 September 2014 $0 ComEd March 2012

Fairbury

Supplier Chosen Integrys Energy Services 4.572 August 2014 $0 Ameren Illinois April 2013

Farina

Referendum Passed Ameren Illinois March 2014

Farmersville

Referendum Passed Ameren Illinois March 2014

Fayette County

Supplier Chosen Homefield Energy 4.333 May 2015 $0 Ameren Illinois April 2013

Findlay

Supplier Chosen FirstEnergy Solutions 4.194 February 2016 $0 Ameren Illinois November 2012

Fisher

Supplier Chosen Integrys Energy Services 4.314 August 2014 $0 Ameren Illinois April 2013

Fithian

Referendum Passed Ameren Illinois April 2013

Flagg Township

Supplier Chosen Energy.Me 5.306 February 2016 $0 ComEd November 2012

Flora Township

Referendum Passed ComEd March 2014

Florence Township

Referendum Passed ComEd March 2014

Flossmoor

Supplier Chosen Verde Energy USA 6.871 July 2016 $0 ComEd March 2012

Forest City

Supplier Chosen Homefield Energy 4.746 June 2016 $0 Ameren Illinois March 2012

Forest Park

Supplier Chosen Integrys Energy Services 7.652 August 2017 $0 ComEd March 2012

Forreston

Supplier Chosen FirstEnergy Solutions 6.61 July 2017 $0 ComEd March 2012

Forreston Township

Supplier Chosen FirstEnergy Solutions 4.861 February 2015 $0 ComEd November 2012

Forsyth

Supplier Chosen Homefield Energy 4.480 June 2016 $0 Ameren Illinois November 2012

Fox Lake

Supplier Chosen FirstEnergy Solutions 4.932 February 2015 $0 ComEd November 2012

Fox River Grove

Program expired in September 2013 ComEd April 2011

Frankfort

Supplier Chosen FirstEnergy Solutions 4.83 October 2014 $0 ComEd March 2012

Franklin

Supplier Chosen Constellation Energy 4.203 March 2015 $0 Ameren Illinois April 2013

Franklin Grove

Supplier Chosen Homefield Energy 7.783 August 2016 $0 ComEd March 2012

Franklin Park

Program Expired in June 2014 ComEd March 2012

Freeport

Supplier Chosen Homefield Energy 7.782 August 2016 $0 ComEd March 2012

Fulton

Supplier Chosen Verde Energy USA 5.987 September 2015 $0 ComEd November 2010

Galesburg

Supplier Chosen Homefield Energy 4.345 March 2015 $0 Ameren Illinois November 2012

Genoa

Supplier Chosen Direct Energy 7.2 July 2015 $0 ComEd March 2012

Georgetown

Supplier Chosen Homefield Energy 4.433 May 2015 $0 Ameren Illinois April 2013

German Valley

Supplier Chosen Homefield Energy 6.999 August 2016 $0 ComEd March 2012

Germantown Hills

Supplier Chosen Homefield Energy 4.580 June 2016 $0 Ameren Illinois March 2012

Gilberts

Supplier Chosen Verde Energy USA 7.936 July 2015 $0 ComEd March 2012

Gilman

Supplier Chosen Homefield Energy 4.333 May 2015 $0 Ameren Illinois April 2013

Glen Carbon

Supplier Chosen Homefield Energy 4.660 June 2016 $0 Ameren Illinois March 2012

Glen Ellyn

Supplier Chosen FirstEnergy Solutions 7.5 August 2017 $0 ComEd November 2012

Glencoe

Supplier Chosen MC Squared 6.688 May 2015 $0 ComEd March 2012

Glendale Heights

Supplier Chosen FirstEnergy Solutions 5.301 January 2015 $0 ComEd November 2012

Glenview

Supplier Chosen MC Squared 6.719 May 2015 $0 ComEd November 2012

Glenwood

Supplier Chosen Constellation Energy 7.74 August 2017 $0 ComEd April 2011

Godfrey

Supplier Chosen Homefield Energy 4.646 June 2016 $0 Ameren Illinois March 2012

Golden

Supplier Chosen Constellation Energy 4.250 March 2015 $0 Ameren Illinois April 2013

Grafton

Referendum Passed Ameren Illinois March 2014

Grand Detour Township

Referendum Passed See Ogle County ComEd April 2013

Grandview

Program expired in May 2014 Ameren Illinois November 2012

Granite City

Supplier Chosen Homefield Energy 4.646 June 2016 $0 Ameren Illinois November 2012

Grant Park

Supplier Chosen FirstEnergy Solutions 5.033 February 2015 $0 ComEd November 2012

Granville

Supplier Chosen Homefield Energy 4.661 November 2015 $0 Ameren Illinois March 2012

Grayslake

Program Expired in July 2014 ComEd April 2011

Grayville

Supplier Chosen Homefield Energy 4.194 June 2015 $0 Ameren Illinois April 2013

Green Oaks

Supplier Chosen Integrys Energy Services 6.74 May 2015 $0 ComEd April 2013

Green Valley

Supplier Chosen Integrys Energy Services 4.054 June 2015 $0 Ameren Illinois April 2013

Greenview

Referendum Passed Ameren Illinois March 2014

Greenville

Supplier Chosen Homefield Energy 4.333 May 2015 $0 Ameren Illinois April 2013

Gridley

Supplier Chosen Homefield Energy 4.333 May 2015 $0 Ameren Illinois April 2013

Griggsville

Referendum Passed Ameren Illinois March 2014

Gurnee

Supplier Chosen FirstEnergy Solutions 6.72 July 2017 $0 ComEd March 2012

Hamel

Supplier Chosen Homefield Energy 4.480 June 2016 $0 Ameren Illinois November 2012

Hamilton

Supplier Chosen Constellation Energy 4.203 March 2015 $0 Ameren Illinois April 2013

Hampshire

Supplier Chosen Verde Energy USA 7.896 July 2015 $0 ComEd March 2012

Hanna City

Supplier Chosen Homefield Energy 4.746 June 2016 $0 Ameren Illinois March 2012

Hanover Park

Program Expired in July 2014 ComEd March 2012

Hanover Township

Supplier Chosen FirstEnergy Solutions 5.36 July 2014 $0 ComEd April 2013

Harlem Township - Stephenson County

Supplier Chosen FirstEnergy Solutions 7.48 August 2017 $0 ComEd April 2013

Harlem Township - Winnebago County

Supplier Chosen FirstEnergy Solutions 6.88 August 2017 $0 ComEd April 2013

Harrison Township

Supplier Chosen FirstEnergy Solutions 7.13 July 2017 $0 ComEd April 2013

Hartford

Supplier Chosen Homefield Energy 4.517 June 2016 $0 Ameren Illinois November 2012

Harvard

Supplier Chosen Homefield Energy 5.411 September 2014 $0 ComEd April 2011

Harwood Heights

Supplier Chosen FirstEnergy Solutions 4.8 August 2014 $0 ComEd March 2012

Havana

Supplier Chosen Homefield Energy 4.746 June 2016 $0 Ameren Illinois March 2012

Hawthorn Woods

Supplier Chosen FirstEnergy Solutions 5.48 February 2017 $0 ComEd November 2012

Hazel Crest

Supplier Chosen FirstEnergy Solutions 5.46 February 2016 $0 ComEd November 2012

Henry

Supplier Chosen Homefield Energy 4.580 June 2016 $0 Ameren Illinois March 2012

Herrin

Supplier Chosen Integrys Energy Services 4.304 August 2014 $0 Ameren Illinois April 2013

Herscher

Supplier Chosen FirstEnergy Solutions 4.983 February 2015 $25 ComEd November 2012

Heyworth

Supplier Chosen Homefield Energy 4.247 February 2015 $0 Ameren Illinois November 2012

Hickory Hills

Program Expired in June 2014 ComEd March 2012

Highland Park

Supplier Chosen Mc Squared 6.688 May 2015 $0 ComEd March 2012

Highwood

Supplier Chosen FirstEnergy Solutions 6.9 May 2017 $0 ComEd March 2012

Hillsboro

Supplier Chosen Homefield Energy 4.309 January 2015 $0 Ameren Illinois November 2012

Hillside

Referendum Passed ComEd November 2012

Hinckley

Supplier Chosen Verde Energy USA 5.118 February 2015 $0 ComEd November 2012

Hinsdale

Supplier Chosen Nordic Energy Services 4.6 July 2015 $0 ComEd March 2012

Hodgkins

Program Expired in June 2014 ComEd April 2013

Hoffman Estates

Supplier Chosen FirstEnergy Solutions 4.96 August 2014 $0 ComEd March 2012

Homer Glen

Supplier Chosen FirstEnergy Solutions 4.83 October 2014 $0 ComEd March 2012

Hoopeston

Supplier Chosen Homefield Energy 4.433 May 2015 $0 Ameren Illinois April 2013

Hopewell

Supplier Chosen Homefield Energy 4.746 June 2016 $0 Ameren Illinois November 2012

Hopkins Park

Referendum Passed ComEd November 2012

Humboldt

Supplier Chosen Homefield Energy 4.580 June 2016 $0 Ameren Illinois November 2012

Huntley

Supplier Chosen Direct Energy 7.2 July 2015 $0 ComEd March 2012

Hurst

Supplier Chosen Homefield Energy 4.395 March 2015 $0 Ameren Illinois April 2013

Hutsonville

Supplier Chosen Homefield Energy 4.580 June 2016 $0 Ameren Illinois November 2012

Illiopolis

Program expired in May 2014 Ameren Illinois November 2012

Ina

Supplier Chosen Homefield Energy 4.194 June 2015 $0 Ameren Illinois April 2013

Indian Head Park

Supplier Chosen Constellation Energy 7.67 August 2014 $0 ComEd November 2012

Inverness

Supplier Chosen Constellation Energy 4.931 March 2015 $0 ComEd November 2012

Ipava

Supplier Chosen Integrys Energy Services 4.181 September 2014 $0 Ameren Illinois March 2012

Irvington

Referendum Passed Ameren Illinois March 2014

Island Lake

Supplier Chosen FirstEnergy Solutions 4.87 August 2014 $0 ComEd March 2012

Itasca

Supplier Chosen Homefield Energy 7.181 through July 2016 July 2017 $0 ComEd March 2012

Iuka

Supplier Chosen Homefield Energy 4.194 June 2015 $0 Ameren Illinois April 2013

Jacksonville

Supplier Chosen Homefield Energy 4.746 June 2016 $0 Ameren Illinois March 2012

Jarvis Township

Supplier Chosen Homefield Energy 4.333 May 2015 $0 Ameren Illinois April 2013

Jerseyville

Supplier Chosen Homefield Energy 4.580 June 2016 $0 Ameren Illinois November 2012

JoDaviess County

Supplier Chosen Verde Energy USA 5.5569 September 2014 $0 ComEd April 2013

Johnston City

Supplier Chosen FirstEnergy Solutions 4.12 March 2015 $0 Ameren Illinois November 2012

Junction City

Supplier Chosen Homefield Energy 4.194 June 2015 $0 Ameren Illinois April 2013

Justice

Supplier Chosen FirstEnergy Solutions 4.87 August 2014 $0 ComEd March 2012

Kane County

Referendum Passed ComEd March 2014

Kankakee

Supplier Chosen Verde Energy USA 5.6067 August 2014 $0 ComEd March 2012

Kankakee County

Supplier Chosen FirstEnergy Solutions 5.083 February 2015 $25 ComEd November 2012

Kansas

Supplier Chosen Homefield Energy 4.557 August 2015 $0 Ameren Illinois April 2013

Kappa

Supplier Chosen Homefield Energy 4.580 June 2016 $0 Ameren Illinois March 2012

Kell

Referendum Passed Ameren Illinois March 2014

Kendall County

Supplier Chosen FirstEnergy Solutions 7.33 August 2017 $0 ComEd March 2014

Kenilworth

Supplier Chosen MC Squared 6.859 May 2015 $0 ComEd March 2012

Kent Township

Referendum Passed ComEd March 2014

Kewanee

Supplier Chosen Homefield Energy 4.915 June 2015 $0 Ameren Illinois March 2012

Kilbourne

Supplier Chosen Homefield Energy 4.746 June 2016 $0 Ameren Illinois March 2012

Kildeer

Supplier Chosen MC Squared 4.964 September 2015 $0 ComEd March 2012

Kingston

Supplier Chosen FirstEnergy Solutions 5.746 June 2015 $0 ComEd April 2013

Kingston Township

Referendum Passed ComEd March 2014

Kinmundy

Supplier Chosen Homefield Energy 4.194 June 2015 $0 Ameren Illinois April 2013

Kirkland

Supplier Chosen FirstEnergy Solutions 4.89 August 2014 $0 ComEd March 2012

Knoxville

Supplier Chosen Energy.Me 4.133 February 2016 $0 Ameren Illinois November 2012

La Grange

Program Expired in June 2014 ComEd November 2012

La Grange Park

Supplier Chosen FirstEnergy Solutions 4.93 September 2014 $0 ComEd March 2012

Lacon

Supplier Chosen Homefield Energy 4.580 June 2016 $0 Ameren Illinois March 2012

Lafayette Township

Referendum Passed ComEd April 2013

Lake Barrington

Supplier Chosen MC Squared 4.819 February 2015 $0 ComEd November 2012

Lake Bluff

Supplier Chosen MC Squared 6.688 May 2015 $0 ComEd March 2012

Lake Forest

Supplier Chosen MC Squared 6.828 May 2015 $0 ComEd March 2012

Lake Villa

Program expired in May 2014 ComEd March 2012

Lake Villa Township (Unincorporated)

Program Expired in May 2014 ComEd April 2013

Lake Zurich

Supplier Chosen Homefield Energy 7.199 July 2016 ComEd March 2012

Lakewood

Supplier Chosen Direct Energy 7.2 July 2015 $0 ComEd March 2012

Lanark

Supplier Chosen Homefield Energy 7.852 August 2016 $0 ComEd March 2012

Lancaster Township

Supplier Chosen FirstEnergy Solutions 5.3 August 2014 $0 ComEd April 2013

Lansing

Program Expired in July 2014 ComEd April 2013

LaSalle

Supplier Chosen Homefield Energy 4.42 July 2015 $0 Ameren Illinois March 2012

Lawrence County

Referendum Passed Ameren Illinois March 2014

Lawrenceville

Supplier Chosen Homefield Energy 4.194 June 2015 $0 Ameren Illinois April 2013

Leaf River

Supplier Chosen FirstEnergy Solutions 4.894 April 2015 0 ComEd November 2012

Leaf River Township

Supplier Chosen FirstEnergy Solutions 4.894 April 2015 $0 ComEd November 2012

Lee

Supplier Chosen Verde Energy USA 5.464 August 2014 $0 ComEd April 2013

Lee County

Supplier Chosen Homefield Energy 7.675 July 2016 $0 ComEd April 2013

Lemont

Supplier Chosen FirstEnergy Solutions 4.83 October 2014 $0 ComEd March 2012

Lena

Supplier Chosen ConEdison Solutions 4.58 November 2014 $0 ComEd March 2012

Lerna

Supplier Chosen Homefield Energy 4.580 June 2016 $0 Ameren Illinois November 2012

Leroy Township

Supplier Chosen FirstEnergy Solutions 5.24 September 2014 $0 ComEd April 2013

Lewistown

Supplier Chosen Integrys Energy Services 4.370 August 2014 $25 Ameren Illinois April 2013

Liberty

Supplier Chosen Constellation Energy 4.203 March 2015 $0 Ameren Illinois April 2013

Libertyville

Supplier Chosen FirstEnergy Solutions 6.57 July 2017 $0 ComEd March 2012

Lincoln

Supplier Chosen Integrys Energy Services 4.181 September 2014 $0 Ameren Illinois March 2012

Lincoln Township

Referendum Passed See Ogle County ComEd April 2013

Lincolnshire

Supplier Chosen Constellation Energy 6.529 May 2017 $0 ComEd March 2012

Lincolnwood

Supplier Chosen Integrys Energy Services 7.585 August 2014 $0 ComEd April 2011

Lindenhurst

Program expired in May 2014 ComEd March 2012

Lisle

Supplier Chosen Constellation Energy 7.318 August 2017 $0 ComEd March 2012

Lockport

Supplier Chosen Verde Energy USA 4.993 November 2014 $0 ComEd November 2012

Logan County

Supplier Chosen Integrys Energy Services 4.181 September 2014 $0 Ameren Illinois March 2012

Lombard

Program Expired in July 2014 ComEd March 2012

Long Creek

Supplier Chosen Integrys Energy Services 4.362 August 2014 $25 Ameren Illinois April 2013

Long Grove

Supplier Chosen Constellation Energy 6.529 May 2017 $0 ComEd March 2012

Loraine

Supplier Chosen Constellation Energy 4.203 March 2015 $0 Ameren Illinois April 2013

Loran Township

Supplier Chosen Homefield Energy 5.917 August 2016 $0 ComEd April 2013

Loves Park

Suppiler Chosen FirstEnergy Solutions 4.66 September 2014 $0 ComEd March 2012

Lovington

Supplier Chosen Homefield Energy 4.660 June 2016 $0 Ameren Illinois November 2012

Lyndon

Supplier Chosen FirstEnergy Solutions 5.433 February 2016 $0 ComEd November 2012

Machesney Park

Program Expired in July 2014 ComEd March 2012

Mackinaw

Supplier Chosen Homefield Energy 4.746 June 2016 $0 Ameren Illinois March 2012

Macon

Supplier Chosen Integrys Energy Services 4.426 August 2014 $25 Ameren Illinois April 2013

Macon County

Program Expired in June 2014 Ameren Illinois November 2012

Madison

Supplier Chosen Homefield Energy 4.580 June 2016 $0 Ameren Illinois November 2012

Mahomet

Supplier Chosen Homefield Energy 4.480 June 2016 $0 Ameren Illinois November 2012

Makanda

Supplier Chosen Homefield Energy 4.395 March 2015 $0 Ameren Illinois April 2013

Malden

Supplier Chosen Homefield Energy 4.23 July 2014 $0 Ameren Illinois March 2012

Malta

Supplier Chosen Verde Energy USA 4.525 August 2014 $0 ComEd March 2012

Manchester

Supplier Chosen Constellation Energy 4.203 March 2015 $0 Ameren Illinois April 2013

Manchester Township

Supplier Chosen FirstEnergy Solutions 5.13 February 2015 $0 ComEd April 2013

Manhattan

Supplier Chosen FirstEnergy Solutions 6.91 July 2017 $0 ComEd March 2012

Manhattan Township

Supplier Chosen Integrys Energy Services 6.7 June 2017 $0 ComEd November 2012

Manito

Supplier Chosen Homefield Energy 4.746 June 2016 $0 Ameren Illinois March 2012

Manteno

Supplier Chosen FirstEnergy Solutions 5.21 January 2015 $0 ComEd November 2012

Maple Park

Supplier Chosen FirstEnergy Solutions 4.99 August 2014 $0 ComEd March 2012

Marion

Supplier Chosen Homefield Energy 4.246 March 2015 $0 Ameren Illinois November 2012

Marion County

Supplier Chosen Homefield Energy 4.333 May 2015 $0 Ameren Illinois April 2013

Marissa

Supplier Chosen Homefield Energy 4.395 March 2015 $0 Ameren Illinois April 2013

Maroa

Supplier Chosen Integrys Energy Services 4.270 August 2014 $0 Ameren Illinois April 2013

Marquette Heights

Supplier Chosen Homefield Energy 4.746 June 2016 $0 Ameren Illinois March 2012

Marseilles

Supplier Chosen Homefield Energy 4.23 August 2014 $0 Ameren Illinois March 2012

Marseilles

Supplier Chosen FirstEnergy Solutions 4.90 August 2014 $0 ComEd March 2012

Marshall County

Supplier Chosen Homefield Energy 4.580 June 2016 $0 Ameren Illinois March 2012

Marshall County

Supplier Chosen Constellation Energy 4.79 August 2014 $0 ComEd March 2012

Martinsville

Supplier Chosen Homefield Energy 4.433 May 2015 $0 Ameren Illinois April 2013

Maryland Township

Supplier Chosen Homefield Energy 5.202 February 2015 $0 ComEd November 2012

Maryville

Supplier Chosen Homefield Energy 4.480 June 2016 $0 Ameren Illinois November 2012

Mason

Supplier Chosen Homefield Energy 4.580 June 2016 $0 Ameren Illinois November 2012

Mason City

Supplier Chosen Homefield Energy 4.746 June 2016 $0 Ameren Illinois March 2012

Mason County

Supplier Chosen Homefield Energy 4.746 June 2016 $0 Ameren Illinois March 2012

Mattoon

Supplier Chosen Homefield Energy 4.480 June 2016 $0 Ameren Illinois November 2012

McCook

Program Expired in June 2014 ComEd March 2012

McLean

Supplier Chosen Homefield Energy 4.580 June 2016 $0 Ameren Illinois March 2012

Mechanicsburg

Program expired in May 2014 Ameren Illinois November 2012

Melrose Park

Program Expired in June 2014 ComEd November 2012

Mendon

Supplier Chosen FirstEnergy Solutions 4.194 December 2015 $0 Ameren Illinois November 2012

Mendota

Supplier Chosen Constellation Energy 6.809 July 2017 $0 ComEd March 2012

Meredosia

Referendum Passed Ameren Illinois March 2014

Metamora

Supplier Chosen Homefield Energy 4.580 June 2016 $0 Ameren Illinois March 2012

Middletown

Referendum Passed Ameren Illinois March 2012

Milan Township

Supplier Chosen FirstEnergy Solutions 5.0 December 2014 $0 ComEd April 2013

Milledgeville

Supplier Chosen FirstEnergy Solutions 5.90 August 2014 $0 ComEd April 2011

Millstadt

Supplier Chosen Homefield Energy 4.333 May 2015 $0 Ameren Illinois April 2013

Mokena

Supplier Chosen Homefield Energy 7.031 July 2016 $0 ComEd March 2012

Momence

Supplier Chosen FirstEnergySolutions 4.983 February 2015 $0 ComEd November 2012

Monmouth

Referendum Passed Ameren Illinois March 2014

Montgomery

Supplier Chosen Verde Energy USA 7.93 August 2015 $0 ComEd March 2012

Monticello

Supplier Chosen Homefield Energy 4.439 May 2015 $0 Ameren Illinois April 2013

Montrose

Supplier Chosen FirstEnergy Solutions 4.194 February 2016 $0 Ameren Illinois November 2012

Morgan County

Supplier Chosen Constellation Energy 4.203 March 2015 $0 Ameren Illinois April 2013

Morris

Supplier Chosen Verde Energy USA 5.032 September 2014 $0 ComEd April 2011

Morrison

Supplier Chosen FirstEnergy Solutions 4.77 September 2014 $0 ComEd March 2012

Morrisonville

Referendum Passed Ameren Illinois March 2014

Morton

Supplier Chosen Homefield Energy 4.660 June 2016 $0 Ameren Illinois March 2012

Morton Grove

Supplier Chosen FirstEnergy Solutions 7.84 July 2017 $0 ComEd March 2012

Mount Morris

Supplier Chosen Constellation Energy 6.752 May 2017 $0 ComEd April 2011

Mount Morris Township

Supplier Chosen FirstEnergy Solutions 5.076 March 2015 $0 ComEd November 2012

Mount Prospect

Supplier Chosen Homefield Energy 7.935 August 2016 $0 ComEd March 2012

Mount Pulaski

Supplier Chosen Integrys Energy Services 4.181 September 2014 $0 Ameren Illinois March 2012

Mount Zion

Supplier Chosen Homefield Energy 4.247 February 2015 $0 Ameren Illinois November 2012

Mt. Sterling

Supplier Chosen FirstEnergy Solutions 4.19 February 2016 $0 Ameren Illinois November 2012

Mt. Vernon

Supplier Chosen Homefield Energy 4.194 June 2015 $0 Ameren Illinois April 2013

Mulberry Grove

Referendum Passed Ameren Illinois March 2014

Muncie

Referendum Passed Ameren Illinois April 2013

Mundelein

Program Expired in June 2014 ComEd March 2012

Murphysboro

Supplier Chosen Homefield Energy 4.395 March 2015 $0 Ameren Illinois April 2013

Murrayville

Supplier Chosen Constellation Energy 4.203 March 2015 $0 Ameren Illinois April 2013

Naperville Township

Supplier Chosen Integrys Energy Services 6.95 June 2017 $0 ComEd November 2012

Naples

Supplier Chosen Constellation Energy 4.203 March 2015 $0 Ameren Illinois April 2013

Nashville

Supplier Chosen Homefield Energy 4.194 June 2015 $0 Ameren Illinois April 2013

Nelson

Supplier Chosen Liberty Power 5.275 March 2015 $0 ComEd November 2012

Neoga

Supplier Chosen Homefield Energy 4.480 June 2016 $0 Ameren Illinois November 2012

New Baden

Supplier Chosen Homefield Energy 4.580 June 2016 $0 Ameren Illinois March 2012

New Berlin

Program expired in May 2014 Ameren Illinois November 2012

New Holland

Supplier Chosen Integrys Energy Services 4.570 September 2014 $0 Ameren Illinois April 2013

New Lenox

Program expired in September 2013 ComEd April 2011

New Lenox Township

Supplier Chosen Integrys Energy Services 6.925 June 2017 $0 ComEd November 2012

New Minden

Supplier Chosen Homefield Energy 4.194 June 2015 $0 Ameren Illinois April 2013

Newark

Supplier Chosen Homefield Energy 4.33 July 2014 $0 Ameren Illinois March 2012

Niles

Supplier Chosen Homefield Energy 7.621 June 2015 $0 ComEd April 2013

Nora

Supplier Chosen Energy.Me 5.411 February 2015 $0 ComEd April 2013

Normal

Supplier Chosen Homefield Energy 4.646 June 2016 $0 Ameren Illinois November 2012

Norridge

Supplier Chosen FirstEnergy Solutions 4.84 August 2014 $0 ComEd March 2012

Norris City

Referendum Passed Ameren Illinois March 2014

North Aurora

Supplier Chosen Verde Energy USA 7.85 September 2015 $0 ComEd April 2011

North Barrington

Supplier Chosen Integrys Energy Services 5.5 July 2015 $50 ComEd March 2012

North Chicago

Supplier Chosen Direct Energy 4.789 June 2014 $0 ComEd March 2012

North City

Supplier Chosen Homefield Energy 4.395 March 2015 $0 Ameren Illinois April 2013

North Pekin

Supplier Chosen Homefield Energy 4.746 June 2016 $0 Ameren Illinois March 2012

North Riverside

Supplier Chosen FirstEnergy Solutions 5.379 February 2015 $25 ComEd November 2012

North Utica

Supplier Chosen Homefield Energy 4.23 July 2014 $0 Ameren Illinois March 2012

Northbrook

Supplier Chosen MC Squared 6.688 May 2015 $0 ComEd March 2012

Northfield

Supplier Chosen MC Squared 6.719 May 2015 $0 ComEd November 2012

Oak Brook

Supplier Chosen Verde Energy USA 5.184 June 2015 $0 ComEd April 2011

Oak Forest

Supplier Chosen FirstEnergy Solutions 6.95 July 2017 $0 ComEd March 2012

Oak Lawn

Supplier Chosen Verde Energy USA 5.118 February 2015 $0 ComEd November 2012

Oak Park

Supplier Chosen Constellation Energy 7.470 April 2015 $0 ComEd April 2011

Oakdale

Supplier Chosen Homefield Energy 4.194 June 2015 $0 Ameren Illinois April 2013

Oakland

Supplier Chosen Homefield Energy 4.580 June 2016 $0 Ameren Illinois November 2012

Oakwood

Supplier Chosen Homefield Energy 4.433 May 2015 $0 Ameren Illinois April 2013

Oblong

Supplier Chosen Homefield Energy 4.480 June 2016 $0 Ameren Illinois November 2012

Odin

Supplier Chosen Homefield Energy 4.194 June 2015 $0 Ameren Illinois April 2013

O'Fallon

Supplier Chosen Homefield Energy 4.580 June 2016 $0 Ameren Illinois November 2012

Ogden

Supplier Chosen Homefield Energy 4.580 June 2016 $0 Ameren Illinois November 2012

Ogle County

Supplier Chosen Homefield Energy 5.985 July 2016 $0 ComEd April 2013

Okawville

Supplier Chosen Homefield Energy 4.194 June 2015 $0 Ameren Illinois April 2013

Old Mill Creek

Referendum Passed ComEd April 2013

Olney

Supplier Chosen Homefield Energy 4.580 June 2016 $0 Ameren Illinois November 2012

Olympia Fields

Supplier Chosen FirstEnergy Solutions 4.98 July 2014 $0 ComEd March 2012

Orangeville

Referendum Passed ComEd March 2014

Oregon

Supplier Chosen Constellation Energy 6.780 August 2017 $0 ComEd March 2012

Oregon-Nashua Township

Referendum Passed See Ogle County ComEd April 2013

Orland Hills

Supplier Chosen FirstEnergy Solutions 4.73 November 2014 $0 ComEd March 2012

Orland Park

Supplier Chosen FirstEnergy Solutions 6.46 May 2017 $0 ComEd March 2012

Orland Township

Supplier Chosen FirstEnergy Solutions 6.74 July 2017 $0 ComEd April 2013

Oswego

Supplier Chosen Verde Energy USA 7.15 July 2016 $0 ComEd March 2012

Ottawa

Program Expired in June 2014 Ameren Illinois March 2012

Owaneco

Referendum Passed Ameren Illinois November 2012

Owen Township

Supplier Chosen Homefield Energy 7.845 August 2016 $0 ComEd April 2013

Palatine

Supplier Chosen Constellation Energy 6.621 May 2017 $0 ComEd March 2012

Palatine Township

Supplier Chosen Constellation Enegy 5.144 September 2014 $0 ComEd April 2013

Palestine

Supplier Chosen Homefield Energy 4.480 June 2016 $0 Ameren Illinois November 2012

Palmer

Supplier Chosen FirstEnergy Solutions 4.19 February 2016 $0 Ameren Illinois November 2012

Palmyra Township

Supplier Chosen FirstEnergy Solutions 5.382 February 2016 $0 ComEd November 2012

Palos Heights

Supplier Chosen Homefield Energy 7.074 July 2016 $0 ComEd March 2012

Palos Hills

Program Expired in July 2014 ComEd March 2012

Palos Park

Supplier Chosen MC Squared 7.151 June 2015 $0 ComEd March 2012

Palos Township

Referndum Passee ComEd March 2014

Paris

Supplier Chosen Homefield Energy 4.480 June 2016 $0 Ameren Illinois November 2012

Park Forest

Supplier Chosen FirstEnergy Solutions 4.98 August 2014 $0 ComEd March 2012

Park Ridge

Supplier Chosen MC Squared 6.688 May 2015 $0 ComEd March 2012

Patoka

Supplier Chosen Homefield Energy 4.194 June 2015 $0 Ameren Illinois April 2013

Paw Paw

Supplier Chosen Verde Energy USA 5.869 July 2015 $0 ComEd April 2013

Pawnee

Supplier Chosen Homefield Energy 4.247 February 2015 $0 Ameren Illinois November 2012

Paxton

Program Expired in June 2014 Ameren Illinois November 2012

Pearl City

Supplier Chosen FirstEnergy Solutions 5.35 March 2016 $0 ComEd November 2012

Pecatonica

Supplier Chosen Integrys Energy Services 7.49 September 2017 $0 ComEd March 2012

Pecatonica Township

Supplier Chosen FirstEnergy Solutions 5.41 August 2014 $0 ComEd April 2013

Pekin

Supplier Chosen Homefield Energy 4.746 June 2016 $0 Ameren Illinois March 2012

Peoria

Supplier Chosen Homefield Energy 4.746 June 2016 $0 Ameren Illinois March 2012

Peoria County

Supplier Chosen Homefield Energy 4.746 June 2016 $0 Ameren Illinois March 2012

Peoria Heights

Supplier Chosen Homefield Energy 4.746 June 2016 $0 Ameren Illinois March 2012

Peotone

Supplier Chosen FirstEnergy Solutions 4.83 October 2014 $0 ComEd March 2012

Percy

Suppler Chosen Homefield Energy 4.395 March 2015 $0 Ameren Illinois April 2013

Perry County

Supplier Chosen Homefield Energy 4.246 March 2015 $0 Ameren Illinois November 2012

Petersburg

Supplier Chosen Homefield Energy 4.380 August 2015 $0 Ameren Illinois April 2013

Philo

Supplier Chosen Homefield Energy 4.439 May 2015 $0 Ameren Illinois April 2013

Pierce Township

Supplier Chosen FirstEnergy Solutions 6.80 August 2016 $0 ComEd April 2013

Pierron

Supplier Chosen Homefield Energy 4.333 May 2015 $0 Ameren Illinois April 2013

Pinckneyville

Supplier Chosen Homefield Energy 4.588 October 2014 $0 Ameren Illinois March 2012

Pine Creek Township

Supplier Chosen FirstEnergy Solutions 5.056 March 2015 $0 ComEd November 2012

Pine Rock Township

Supplier Chosen FirstEnergy Solutions 5.405 February 2016 $0 ComEd November 2012

Pingree Grove

Supplier Chosen FirstEnergy Solutions 4.93 August 2014 $25 ComEd March 2012

Pittsburg

Supplier Chosen Homefield Energy 4.395 March 2015 $0 Ameren Illinois April 2013

Pittsfield

Supplier Chosen Homefield Energy 4.480 June 2016 $0 Ameren Illinois November 2012

Plainfield

Supplier Chosen FirstEnergy Solutions 4.83 October 2014 $0 ComEd March 2012

Plano

Supplier Chosen FirstEnergy Solutions 4.81 August 2014 $0 ComEd March 2012

Pleasant Plains

Program expired in May 2014 Ameren Illinois November 2012

Pocahontas

Supplier Chosen Homefield Energy 4.333 May 2015 $0 Ameren Illinois April 2013

Polo

Supplier Chosen Constellation Energy 6.791 July 2017 $0 ComEd April 2011

Pontiac

Program Expired in July 2014 ComEd April 2013

Pontoon Beach

Supplier Chosen Homefield Energy 4.580 June 2016 $0 Ameren Illinois November 2012

Poplar Grove

Supplier Chosen Liberty Power 5.182 March 2016 $0 ComEd November 2012

Poplar Grove Township

Supplier Chosen Homefield Energy 5.901 August 2015 $0 ComEd April 2013

Prairie Du Rocher

Supplier Chosen Homefield Energy 4.395 March 2015 $0 Ameren Illinois April 2013

Prairie Grove

Supplier Chosen Integrys Energy Services 6.99 August 2017 $0 ComEd March 2012

Princeville

Supplier Chosen Homefield Energy 4.247 February 2015 $0 Ameren Illinois November 2012

Prophestown

Supplier Chosen FirstEnergy Solutions 5.527 February 2016 $0 ComEd November 2012

Quincy

Supplier Chosen FirstEnergy Solutions 4.194 December 2015 $0 Ameren Illinois November 2012

Randolph Township

Supplier Chosen Homefield Energy 4.247 February 2015 $0 Ameren Illinois November 2012

Raymond

Referendum Passed Ameren Illinois March 2014

Reddick

Supplier Chosen FirstEnergy Solutions 4.983 February 2015 $25 ComEd November 2012

Richland County

Supplier Chosen Homefield Energy 4.580 June 2016 $0 Ameren Illinois November 2012

Richview

Referendum Passed Ameren Illinois March 2014

Riddott

Supplier Chosen FirstEnergy Solutions 5.674 January 2016 $0 ComEd November 2012

Ridge Farm

Supplier Chosen Homefield Energy 4.433 May 2015 $0 Ameren Illinois April 2013

Ridott Township

Referendum Passed ComEd March 2014

Ringwood

Supplier Chosen Direct Energy 7.2 July 2015 $0 Comed March 2012

River Forest

Supplier Chosen Integrys Energy Services 7.373 June 2015 $0 ComEd March 2012

River Grove

Supplier Chosen FirstEnergy Solutions 4.91 August 2014 $25 ComEd March 2012

Riverside

Supplier Chosen FirstEnergy Solutions 7.81 June 2017 $0 ComEd March 2012

Riverside Township

Supplier Chosen Constellation Energy 4.203 March 2015 $0 Ameren Illinois April 2013

Riverwoods

Supplier Chosen MC Squared 4.812 August 2015 $25 ComEd March 2012

Roanoke

Supplier Chosen Homefield Energy 4.580 June 2016 $0 Ameren Illinois March 2012

Robinson